My team mate doesn't seem to be very hard working

D

Deleted member 17791

Insane in the brain
Joined
Feb 15, 2022
Posts
40,960
Reputation
66,050
I'm in a group of two doing an assignment and we have three weeks. We decided that I'll do all the odd parts and he'll do the even ones, basically splitting the work in half.

Well I've already finished the first part of the assignment, part 1. It took me like an hour or two total. I submitted so he can finish his job.

The so by time we met up at uni during our class, he was nearly finished with his part but he made several mistakes that I had to point out. Oh and he didn't start his task when I submitted the file, he started at the same time I had, so it took him a week to provide some bad work that needed to be corrected./

I'm scared he'll end up ruining the assignment and not get much work done at all. What would happen if he keeps taking a whole week to finish a single part? We only have like three weeks and there are 9 parts. Surely I can't just wait around for his likely not satisfactory work.

I think I should treat this situation as if it's a single person assignment nd just get it all done. I can definitely do that I have lots of time still, better to do that before shit hits the fan.
 

Similar threads

AuraMaxxing
Replies
35
Views
853
klip11
klip11
fr0st
Replies
49
Views
761
roadtochang123
roadtochang123
D
Replies
16
Views
215
Deleted member 32898
D
sqm
Replies
3
Views
138
venom418
venom418
Rabbi
Replies
9
Views
319
prhmq
prhmq

Users who are viewing this thread

Back
Top