My team mate doesn't seem to be very hard working

D

Deleted member 17791

Insane in the brain
Joined
Feb 15, 2022
Posts
40,960
Reputation
66,027
I'm in a group of two doing an assignment and we have three weeks. We decided that I'll do all the odd parts and he'll do the even ones, basically splitting the work in half.

Well I've already finished the first part of the assignment, part 1. It took me like an hour or two total. I submitted so he can finish his job.

The so by time we met up at uni during our class, he was nearly finished with his part but he made several mistakes that I had to point out. Oh and he didn't start his task when I submitted the file, he started at the same time I had, so it took him a week to provide some bad work that needed to be corrected./

I'm scared he'll end up ruining the assignment and not get much work done at all. What would happen if he keeps taking a whole week to finish a single part? We only have like three weeks and there are 9 parts. Surely I can't just wait around for his likely not satisfactory work.

I think I should treat this situation as if it's a single person assignment nd just get it all done. I can definitely do that I have lots of time still, better to do that before shit hits the fan.
 

Similar threads

Shyde
Replies
5
Views
192
TrueSlavic
TrueSlavic
Beanermaxxer
Replies
19
Views
460
Beanermaxxer
Beanermaxxer
Panzram
Replies
19
Views
265
DR. NICKGA
DR. NICKGA
V
Replies
26
Views
383
Bitchwhipper2
Bitchwhipper2
beautyiswhatwedesir
Replies
7
Views
432
beautyiswhatwedesir
beautyiswhatwedesir

Users who are viewing this thread

Back
Top